Delivering critical safety improvements while securing the long-term future of the estate.

Read on
Roding Valley High School RAAC

Archer Building Consultancy Ltd led the removal of RAAC from A Block – delivering vital structural improvements within a live school environment, and leaving the block safe for future generations. 

The project required meticulous planning and rigorous safety protocols to ensure continuity of school operations throughout.

Services Provided:
Principal Designer
Concept Design
Detailed Design
Technical Design
Procurement
Project Management

Delivered with Leary Brothers Ltd

Transformative Outcome:
A secure, safe and compliant environment that provides long-term reassurance and confidence.

Overview

  • Roding Valley High School, Loughton
  • RAAC Removal
  • £4.8m