Roding Valley High School
Delivering critical safety improvements while securing the long-term future of the estate.
Read on
Archer Building Consultancy Ltd led the removal of RAAC from A Block – delivering vital structural improvements within a live school environment, and leaving the block safe for future generations.
The project required meticulous planning and rigorous safety protocols to ensure continuity of school operations throughout.
Services Provided:
Principal Designer
Concept Design
Detailed Design
Technical Design
Procurement
Project Management
Delivered with Leary Brothers Ltd
Transformative Outcome:
A secure, safe and compliant environment that provides long-term reassurance and confidence.
Overview
- Roding Valley High School, Loughton
- RAAC Removal
- £4.8m